Part1
| Quality, Quality Assurance, Quality Control &CMM Levels. |
| Difference between Application/Project and Product. |
| Hierarchy of the Organisation. |
| Project life cycle - Process |
| Introduction of Software Testing. |
| Difference between Manual and Automation Testing? |
| Good Software Test Engineer Qualities. |
| Why we need to Testing? |
| Challenges of Software Test Engineers. |
| Overview of Automation Tools and its versions. |
| SDLC Phases |
| SDLC Models: V-Model,(Verification & Validation, Static and Dynamic Testing) Waterfall, Agile - Scrum.
Configuration Management. |
| Test Methodlogies and Testing types/ levels |
|
Part2
| Test Life Cycle Phases |
| Test Plan and its purpose. Who will prepare the Testplans? When do we prepare the Test plan? Contents of the Test plan |
| Preparing Test Scenarios,Test Case &Test Scripts. |
| Black Box Testing Test Case designing techniques |
| Positive Testing and Negative Testing |
| High Level and Low level Testcases. Precautions while writing test cases. GUI Common Tesecases |
| Traceability Matrix |
| Difference between Error, Bug and Defect Bug / Defect Life Cycle |
| (Severity, Priority) level examples |
| Main contents of reporting Bugs/ Defects. Why software has Bugs? |
| Test data, Test Bed and Test set up Environment. |
| Case studies for Test Case Preparation. |
| What if there isn't enough time for thorough testing? |
|
Part3
| What is Architecture? |
| Types of Archetectures? |
| Difference between Client Server / Web based application |
| what type of testings conducted for Client Server / Web based applications? |
| Testing Types - Unit, Interface, Smoke, GUI, Usability, Integration, Adhoc, fuctionality, Recovery, Retest, Regression, Globalisation, Exploratory, System, End to End, Database, Browser Camapatibility, Performance, Load, Stress, Volume, Security, Sanity, Installation and Acceptance Testing. |
| Difference between Functionality and Non-Functionality Testing. |
| Checklists, Weekly status Reports, Test Closure , Status Reports & Release Notes. |
| Roles and Responsibilities of TM, TL & TE/TA |
|
Part4
| Quality Center, Introduction to Quality Center, Starting Quality Center |
| Defining Releases, Cycles and Requirements |
| Planning Tests & Running Tests |
| Adding and Tracking Defects, Alerting on Changes, Analysing the Testing Process |
| FAQ's on Manual testing |
| Material - SQL, MS Excel |
| Provide Sample Profiles, CV preparation tips |
| Agency Contact list, ISEB Material & Sample Question papers. |
|